Operational Data
Archive Temporary SWPP Flowgates
The remaining amount of MWs available for generation outages to be scheduled for the given day. This number is calculated from a SPP BA Capacity standpoint. Example: If a given MKTDAY has 500 Additional MWs Available for Maintenance, then an outage submission of a generator across that MKTDAY with a max capability of up to and including 500 MWs would be acceptable. An outage submission of a generator across that MKTDAY with a max capability over 500 MWs would be denied. Please note that this margin is one of many criteria used in determining if a generation outage may be approved. A generation outage may be denied for other reasons even if it falls within the acceptable MW range based on the calculated margin.
Monthly summary report for previous month Contingency Reserve Deployment
Permanent SWPP Flowgates
Wind and Solar Forecast for the next 168hrs and Actual for the previous 24hrs by Reserve Zone.
Temporary SWPP Flowgates